We manufactured for the chemical industry, a maintenance access gateway. The entire study was carried out in-house: we designed the 3D model, made the 2D drawing and performed the calculations for checking connections, sections and powders according to the Eurocodes standard. The footbridge was manufactured in our workshop, then painted by our subcontractors and installed on site by our team.